ERATH COUNTY COVERAGE (FIPS 48143) | STEPHENVILLE & DUBLIN

Stephenville, Dublin & Bluff Dale Concrete Slabs & Metal Buildings

Serving property owners across Stephenville (76401), Dublin (76446), Bluff Dale (76433), Morgan Mill, and the US-377 / US-281 ranching corridor.

CONCRETE SLAB & BUILDING CALCULATOR

Calculate exact ready-mix cubic yards, 9-yard mixer truck loads, bag counts, weight, and TxDOT foundation cost benchmarks instantly.

DIMENSIONS & SLAB SPEC
FT
FT
FT
PROJECT SCOPE
  • → Includes thickened 12"x24" perimeter grade beams and 8% subgrade waste factor
  • → 3,500 PSI ready-mix within a 90-minute ASTM C94 batch-plant radius
  • → Anchor-bolt layout matched to Mueller, Prime, Brazos, or custom weld-up frames
TECHNICAL RESULT LIVE SPEC
~31 Cu. Yds.
Includes 12"x24" perimeter beam & 8% waste factor • 1,500 SF (14'H)

9-YD MIXER TRUCKS 4 Trucks (62.8T) Batch-plant delivery
BAGS (80LB EQUIV) 1,395 Bags At 150 lbs / cu ft
GRADE BEAM & REBAR 160 LF / 3,640 LF Beam / Deformed Bar
READY-MIX MATERIAL ~$5,208 ~31 Cu. Yds. @ $168/yd

TXDOT / DFW FOUNDATION BENCHMARK 1,500 sq ft @ $7.24 - $15.25/sf Selected Scope: Slab + 6"-18" Select Fill Pad.
$10,860 - $22,875 Median $11.25/sq ft (~$16,875)
LOCK IN THIS SPEC & REQUEST LOCAL QUOTE ↓
View 2D Anchor-Bolt Plan, 3D Slab Cutaway & Kit Options
30' W x 50' L x 14' H (1,500 SQ FT)
ANCHOR BOLT & BEAM PLAN 30' x 50' (8 Anchor Columns) 160 LF Grade Beam + 5' Pad Apron 5" REINFORCED SLAB (3,500 PSI) | 1,500 SQ FT #4 Rebar @ 12" OC | 12" x 24" Grade Beam (160 LF) 6"-18" SELECT FILL PAD + 10-MIL VAPOR BARRIER READY-MIX: ~31 CU. YDS. (4 TRUCKS | 62.8 TONS)
26-GA COLOR: Limestone Tan / Burnished Slate
GET YOUR LOCAL SITE QUOTE & SPEC SHEET Submit your property details below to route this volume takeoff to our local North Texas concrete & building crew.
Selected: 30' x 50' (1,500 SF) | ~31 Cu. Yds.
PREFERRED DELIVERY CHANNELS:

Services

We handle the complete foundation and erection stack from dirt to finish across Parker, Hood, Wise, Erath, Palo Pinto, Somervell, and Jack Counties.

3,500 PSI + 12"x24" BEAM #4 REBAR GRID @ 12" OC

Single-pour commercial & residential foundations with 12"x24" perimeter grade beams, 10-mil vapor barrier, and #4 rebar on chairs.

Concrete Slab Specs→
ROTARY LASER LEVEL PAD TXDOT ITEM 132 SELECT FILL

Topsoil stripping, cedar & mesquite clearing, and compacted low-PI select-fill lifts built to stabilize expansive North Texas clay.

Site Prep Specs→
MUELLER / PRIME / BRAZOS / JAG

Bought a steel package from Mueller, Prime, Brazos, or JAG? We pour the wet-set anchor slab and erect your bolt-up or weld-up frame.

Kit Erection Scope→
DIRT PAD + SLAB + 26-GA BUILDING

Single-point coordination for your laser-graded select-fill pad, monolithic concrete slab, structural steel frame, and 26-gauge sheeting.

Turnkey Building Specs→

Texas Metal Buildings & Slab Specs

Standard footprints from 24x30 garages to 60x100 commercial buildings with pre-calculated concrete yardage, mixer truck counts, and foundation benchmarks.

How It Works

From instant concrete yardage takeoff to on-site laser elevation verification in 4 steps.

STEP 01

Calculate Your Slab & Building

Select a standard 24x30 to 60x100 footprint or enter custom dimensions to get exact cubic yards, mixer trucks, and DOT cost benchmarks.

STEP 02

Choose Your Trade Scope

Select Concrete Slab Only, Slab + Select-Fill Pad, Pre-Engineered Kit Erection, or a complete Dirt-to-Finish Turnkey Building.

STEP 03

Batch-Plant & Pad Check

We verify your ZIP code's 90-minute ready-mix haul radius, soil plasticity index, and laser pad slope for an accurate local quote.

STEP 04

Direct Local Crew Dispatch

Your spec sheet routes one-to-one to our designated county concrete and steel erection crew with zero broker spam.

Engineering & Cost Guides

Field guides covering monolithic grade beams, low-PI select fill pads,
Mueller/Prime/Brazos kit erection, and Texas Chapter 233 county rules.

Concrete Foundation Pricing 9 min read

2026 Monolithic Concrete Slab Cost Per Sq Ft in Weatherford, Granbury & North Texas (24x30 to 60x100)

What does an engineered monolithic concrete foundation actually cost across Weatherford, Granbury, Stephenville, and Decatur in 2026? Here is the exact line-item breakdown for 3,000 to 4,000 PSI ready-mix, #3 vs #4 deformed rebar grids, 12x24 perimeter grade beams, and compacted select fill pads.

Kit Erection & Foundations 8 min read

Mueller, Prime, Brazos & JAG Metal Building Kit Erection + Concrete Slab Costs (2026 North Texas Guide)

Mueller Inc., Prime Metal Buildings, Brazos Metal Building Systems, and JAG Metals manufacture outstanding steel building packages across North Texas, but none of them pour concrete slabs or erect the steel. Here is how much erection labor, anchor-bolt coordination, and foundation work cost in 2026.

Permits, Codes & Acreage Rules 7 min read

Do You Need a Building Permit for a Metal Shop or Barndominium on Unincorporated Land in Parker, Hood, Wise or Erath County? (Texas Chapter 233)

Over 80% of our concrete slab and metal building builds happen on unincorporated 1-to-50 acre tracts outside municipal city limits. Here is what Texas Local Government Code Chapter 233 allows, which county permits STILL apply (septic, floodplain, driveway culverts), and how incorporated city permits work.

CALCULATOR & ENGINEERING FAQ

Frequently Asked Questions

1. How does the calculator determine cubic yards and mixer truck loads?
The calculator multiplies your slab width, length, and thickness (4", 5", or 6") to find the deck volume, adds the thickened 12"x18" to 16"x28" perimeter and interior cross grade beams, converts cubic feet to cubic yards (dividing by 27), and includes an 8% subgrade/trench allowance. Standard ready-mix trucks haul 9 cubic yards per load.
2. Where does the $7.24 - $15.25/sq ft Foundation Benchmark come from?
Rather than guessing contractor bids, our calculator displays two transparent reference metrics: (1) estimated batch-plant ready-mix concrete material cost based on cubic yardage, and (2) the regional TxDOT / DFW DOT Bid Foundation Cost Index ($7.24 to $15.25 per square foot, median $11.25/sq ft across 49 regional foundation bids). Actual turnkey quotes for pad grading, slab labor, and building erection are provided after reviewing your site.
3. Can I request a slab and erection quote for a Mueller, Prime, Brazos, or JAG kit?
Yes. Select "Kit Erection" in the calculator and choose your kit supplier in the optional drawer. Your local quote will cover laser pad grading, pouring the monolithic slab to match your manufacturer's Anchor-Bolt Setting Plan, and erecting the steel frame.
4. Do unincorporated county properties in Texas require a county building permit?
Under Texas Local Government Code Chapter 233, Texas counties do not issue structural building framing permits in unincorporated areas outside city limits (though septic/OSSF, floodplain, and HOA rules still apply). Properties inside incorporated city limits require municipal permits and engineered drawings.